Jump to content
TriFOD
  • Welcome!

    Welcome to TriFOD, Hyderabad discussion platform for Travel, Housing, Food etc. Please register to join us for free.

Recommended Posts

Project name : Aurobindo Kohinoor
 

Builder company/name : Aurobindo

 

Project price(per sqft) : 7300/-


Project location: HiTech City

 

Google maps link :  https://g.page/KohinoorAurobindoRealty?share

 

Project Status: Under construction

 

RERA Registration: P02400001822

Link

 

Project Timeline:  2026

 

Project Amenities: All modern amenities 

 

Project details: 

Kohinoor-EBrochure-01.jpg

Kohinoor-EBrochure-02.jpg

Kohinoor-EBrochure-03.jpg

Kohinoor-EBrochure-04.jpg

Kohinoor-EBrochure-05.jpg

Kohinoor-EBrochure-06.jpg

Kohinoor-EBrochure-07.jpg

Kohinoor-EBrochure-08.jpg

Kohinoor-EBrochure-09.jpg

Kohinoor-EBrochure-10.jpg

Kohinoor-EBrochure-11.jpg

Kohinoor-EBrochure-12.jpg

Kohinoor-EBrochure-13.jpg

Kohinoor-EBrochure-14.jpg

Kohinoor-EBrochure-15.jpg

Kohinoor-EBrochure-16.jpg

Kohinoor-EBrochure-17.jpg

Kohinoor-EBrochure-18.jpg

Kohinoor-EBrochure-19.jpg

Kohinoor-EBrochure-20.jpg

Kohinoor-EBrochure-21.jpg

Kohinoor-EBrochure-22.jpg

Kohinoor-EBrochure-23.jpg

Kohinoor-EBrochure-24.jpg

Kohinoor-EBrochure-25.jpg

Kohinoor-EBrochure-26.jpg

Kohinoor-EBrochure-27.jpg

Kohinoor-EBrochure-28.jpg

Kohinoor-EBrochure-29.jpg

Kohinoor-EBrochure-30.jpg

  • Like 1
Link to post
Share on other sites
  • 2 months later...

The phase 2 of this venture is at pre launch stage right now.. The block in phase 2 is exclusive to 3 BHKs only. 
Prelaunch price : 7,777 per sft

Launch price : 8,000 per sft

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Content

    • By Gowtham
      Project name : Mahidhara Projects 
       
      Builder company/name :  Mahidhara
       
      Project Status: Under Construction 
       
      Project price(per sqft) : 22,000 per sqyd 
      Villas starting from 47 lakhs 
       
      Project location:  Isnapur 
       
      Google maps link : https://goo.gl/maps/p6SPjdbb6TJTVqYGA

      Project RERA: NA
       
      Possession Timeline:  Two years
       
      Project Amenities: 
       
      Project details:
       














    • By Gowtham
      Project name : Seven
       
      Builder company/name : Frontline
       
      Project Status: Under construction
       
      Project price(per sqft) : 5400/-
       
      Project location:  Kokapet
       
      Google maps link : https://goo.gl/maps/EB1fTK7EruvCttLRA

      Project RERA: LINK
       
      Possession Timeline: 2024
       
      Project Amenities:  All modern amenities  
       
      Project details:
       



    • By mayank
      Project name :  Vaishnavi Oasis
       
      Builder company/name : Vaishnavi Infracon
       
      Project Status: Under Construction
       
      Project price(per sqft) : 5,500
       
      Project location:  Bandlaguda jagir, Near APPA junction
       
      Google maps link : https://goo.gl/maps/xyDpHzQbEjVukn4d9
       
      RERA:  NA
       
      Possession Timeline:  
       
      Project Amenities: All modern amenities 
       
      Project details:
      4 Acres
      6 Towers
      336 Flats
       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

    • By Gowtham
      Project name :  Ashoka Spire
       
      Builder company/name : ABSL
       
      Project Status: Under Construction
       
      Project price(per sqft) : 
       
      Project location:  Kokapet
       
      Google maps link : https://goo.gl/maps/S4Yrv16kgZ83rmM68
       
      RERA:  http://rerait.telangana.gov.in/PrintPreview/PrintPreview/UHJvamVjdElEPTQwMzcmRGl2aXNpb249MSZVc2VySUQ9NDE1NzYmUm9sZUlEPTEmQXBwSUQ9MTY0NTEmQWN0aW9uPVNFQVJDSCZDaGFyYWN0ZXJEPTYzJkV4dEFwcElEPQ%3d%3d
       
      Possession Timeline:  November 2023
       
      Project Amenities: All modern amenities 
       
      Project details:
       












    • By shiva
      Project name : Smondo
       
      Builder company/name : Patel Reality 
       
      Project Status:  Almost completed
       
      Project price(per sqft) : 7000/-
       
      Project location:  Gachibowli
       
      Google maps link : https://goo.gl/maps/jmqar1Rekds2wxWUA

      Project RERA:
       
      Possession Timeline: 
       
      Project Amenities: 
      Elegant arrival experience with landscaped forecourts and water bodies Adequate covered car parking High speed elevators for each tower & two dedicated service elevators Multipurpose hall Games, yoga & meditation room Designer entrance and lift lobby Well equipped gym with toilets and changing areas Recycled water supply system and rain water harvesting  
      Project details:
       






  • Our picks

    • Hyderabad to Gottamgutta, A short weekend getaway..
      Distance: 120 kms.  Road condition: Excellent (upto Zaheerabad) You divert from the highway towards Chincholi forest reserve near the Mahindra factory exit. The road is a single lane road and through the farms. 
        We started from Miyapur around 7 AM in 3 cars. Packed all the food and water. 
      Note: Be sure to carry your shoes as there would be a short trek to reach the banks of the lake. 
      I will let the pictures do the talking.   The road towards the Chincholi forest after getting down the NH 65

      The weather was good as the sun shone gently on us that morning


      The entry gate of the Chincholi forest was very welcome


      Though it was a mud track beyond the gate, the drive was smooth and fun.

       
      The track will is pretty narrow to just fit in 1 car at a time



      Our first pit stop was a small temple enroute amidst the Chincholi forest

       

       
        • Like
      • 31 replies
    • Hyderabad Weekend Getaways under 200 kilometers
      Weekend getaways
        • Like
      • 67 replies
    • Road trip in Electric Vehicle, San Francisco to Los Angeles
      Sharing a road trip experience in Tesla, will be update this log on daily basis(Three days trip). 
      This is not a leisure travel, We had to go on a work trip from SF to LA.
      I will be sharing road trip experience in EV with Pros and Cons when compared with ICE cars.

       
      Car Specifications:
      Range: 600 kilometers per charge (EPA) 0-100: 3.8 Seconds Top speed is limited to 250km/hr  Supports upto Level-3 charging : 250KW/hr Will be sharing more information on Tesla Super chargers in the upcoming posts  
      A day before the trip
       
      Planning:
      Road trips in electric cars need some planning when compared to traditional(ICE) cars. 
       
      STEP 1: 
      You can use Tesla website to plan your trip, Select the car that you are planning to take on a drive Check out the website for fun : https://www.tesla.com/trips SF to LA has close to 10+ Tesla super chargers(Distance : 600+ kilometers)
       
      STEP 2: 
      Calculate total charging time required, you can check Tesla website to understand your trip plan Total charging time required on a 616 kilometers trip is 55 minutes Details given above are in ideal conditions: 90% charge before you start, follow speed limits, no opposite wind, no cold weather(below 0C), no snow storm etc In real world, range varies, this is similar to our ARAI mileage Tesla calculates/displays range based on EPA(ARAI), add 15~20% range error All the Tesla Chargers are located close to some of the best food courts/restrooms  Total saving for the trip when compared with gas cars is 52$
       
      If you have any queries comment below, will answer them.
        • Like
      • 5 replies
    • Ola mega electric factory, can produce 30 EV's per minute
      Product capacity 20 lakhs two wheelers per year 500 Acers 10,000 jobs, you can apply here (https://olaelectric.com/) 10 production lines Will produce an EV every 2 seconds First Indian electric two-wheeler company to begin international exports
       
      Key Specs:
      100 kilometers per charge Top speed 100km/hr  
      Check out the video:
       
        • Like
      • 1 reply
    • New e-Pass Requirements by States (March 2021 onwards)
      Hi all,
      I wanted to create the list of states re-imposing e-pass requirements to travel, including  by road.
      Here's what I found. Please add to the list and also once it is lifted, please update the thread.
      I hope it will be helpful
       
      Tamil Nadu
      Dated 9-Mar-2021
      All passengers coming by road and by flight to Tamil Nadu need an e-pass, the state government has decided, in a slew of new rules for domestic and international passengers coming to the state. All passengers from states, except Andhra Pradesh, Karnataka and Puducherry, need an e-pass to enter the state. 
      https://www.thenewsminute.com/article/passengers-coming-tamil-nadu-need-e-pass-here-s-how-apply-144882
        • Like
      • 14 replies
×
×
  • Create New...