Investment in Under construction Apartments at Kollur
-
Similar Content
-
By sagar
Project name : Sri Sai Soukya
Builder name : Hari Hara
Project price(per sqft) : 5,000/- per sft
Project location: Uppal
Google maps link : https://goo.gl/maps/jxJpGSkQwD5B5o357
Project Status: Under Construction
RERA Registration: NA
Project Timeline:
Block B&C - May 2021
Block A&D - December 2021
Project Amenities: All modern amenities
Project details:
52nd venture in Hyderabad
3.5 acres land
4 blocks
total number of flats is 185
each block ground + 5 floors
3Bhk flats from 1538 sft to 2053 sft sizes
-
By sagar
Project name : Jaagaruthi Elite
Builder company/name : Praneeth Group
Project Status: Under construction
Project price(per sqft) : 4,400/-
Project location: Kollur
Google maps link : https://goo.gl/maps/RjgibKjhzNRyDFK49
Project RERA: P01100001458
Possession Timeline: 2022 May
Project Amenities: All modern amenities
Project details:
2.2 Acres
G+8 Floors
144 Flats
3 BHK Premium Apartments (1466 - 2270)
-
By mit1682
Received form 35 and NOC from SBI on 06 Feb 2021. I was happy that loan closed but next challenge was how to contact RTO of hypothecation removal.
Searched on internet and there was mixed response.
Contacted few agents, they quoted me charges ranging from 1200 to 2500 based on how urgent we need it.
But decided to give a try by myself. Searched on net and found below link,
https://www.transport.telangana.gov.in/html/registration-hptermination.html
Once you will click it, it will redirect to other link shown as below
https://tgtransport.net/tgcfstonline/Registration/RegistrationOnline.aspx?Trans=HAT
click on Hypothecation/ Hire Purchase/ Lease Termination
If you have original RC then click on YES. Then below window will be open
Once you will type above details, in next window you will get your full details. I was not sure whose number to be typed at financer mobile number i typed mine alternate number and it worked 😆. Once click you will be directed to slot booking window (image only for ref)
Click on available slot. Once that is done you will be asked to pay charges. (image just for ref) fees is around 635. Take print out of it (important)
Once all done take below document to respective RTA. Below documents required
1. Original RC
2. Printout of slot booking form
3. Form 35, 2 nos (original)
4. NOC from bank (original)
5. Valid insurance (Xerox)
6. Aadhar (Xerox)
7. One small polythene pouch to keep original RC in it. At RTA they are charging Rs 5. And for printout it is Rs 10
also keep below doc in case they want (not asked to me)
1. PUC Xerox
2. PAN card Xerox
3. Residence proof
In my case it was RTA Rangareddy. Mine slot booking was on 12 Feb 2021 01:40 to 01:50
Reached there around 12. Agents started chasing me. But i decided not to pay attention. Went to window No 4. Waited for 10 min.
Officer took my documents checked for 30 seconds and issued me slip. Asked me to go to window 6 for photo.
Went to window 6 waited for 10 min. officer took my slip, done some typing on screen took my photo and signature. And told me that RC will be received via post.
Everything done in 30 min of time, no agent.
Mine application is approved on same day. Now waiting for RC😏
-
By Gowtham
Project name : AVASA
Builder company/name : EVK
Project Status: Prelaunch
Project price(per sqft) :
PRE LAUNCH : 3199/SFT Regular price: 4500/SFT(Registration,GST,car parking and amenities Extra)
Project location: Kollur
Google maps link : https://goo.gl/maps/u9gxW6fTi8UnpU2y7
Project RERA: NA
Possession Timeline: NA
Project Amenities: All modern amenities
Project details:
8.5 acres Luxury Gated Community project 2 & 3 BHK FLATS,Size Ranging from 1040 to 2415 SFT Pollution Free Zone for Healthy Life 1 km from Hyderabad ORR Exit no :2 Near by Kollur IT SEZ.( GOOGLE & APPLE IT Companies under construction ) 10 mins drive from Gachibowli IT & Financial District 5 High rise towers G+17 floors with 2 cellars 100% vastu, 24/7 security and solar fencing World class club House with 5 floors Near by International Schools(Samasthi,Gaudium,Delhi) and colleges(CBIT,ISB,ICFAI) Surrounded by Villa projects and High Rises Apartments Near to Edulanagulapalli South Indian Railway Hub
-
By sagar
Project name : Sky Garden
Builder company/name : My square realty
Project Status: Pre-Launch
Project price(per sqft) : 3,200/-
Registration after full payment / MoU option available.
Project location: Kollur
Google maps link :
https://goo.gl/maps/BhSDaocZ3fDcBTmr9
RERA Registration:
Not available
Possession Timeline: Dec 2023
Project Amenities:
Club House Parking Modern amenities 100% Power Backup, Co-Working Space, Swimming Pool, Mini Zoo Mini Forest Mini Water falls
Project details:
3.5 Acres 2 Towers (15 floors Each) 5 Level Clubhouse Basement I&II+Stilt+15 Floors 395 Luxury Flats (2 BHK 1200-1350sft 3BHK 1600-2000 sft) 14th & 15th Floors Sky villa’s 16 th floor Terrace Garden, Skywalk bridge over two towers
Location Highlights:
180 degrees ORR facing,Kollur 100&40 feet Corner Land Beside Preston Anvita Villas Opp Bloosam Heights Gated Community Near Samshti School 5 min from Delhi Public school 5 min from Gaudiam school 7 min from Birla Open mind School 10 mins from Financial District 15 mins drive to all IT companies (Hitech city, Inorbit, IKEA)
-
-
Our picks
-
Hyderabad to Gottamgutta, A short weekend getaway..
tejub posted a topic in Road Trips,
Distance: 120 kms. Road condition: Excellent (upto Zaheerabad) You divert from the highway towards Chincholi forest reserve near the Mahindra factory exit. The road is a single lane road and through the farms.
We started from Miyapur around 7 AM in 3 cars. Packed all the food and water.
Note: Be sure to carry your shoes as there would be a short trek to reach the banks of the lake.
I will let the pictures do the talking. The road towards the Chincholi forest after getting down the NH 65
The weather was good as the sun shone gently on us that morning
The entry gate of the Chincholi forest was very welcome
Though it was a mud track beyond the gate, the drive was smooth and fun.
The track will is pretty narrow to just fit in 1 car at a time
Our first pit stop was a small temple enroute amidst the Chincholi forest
-
-
- 31 replies
Picked By
Gowtham, -
-
Hyderabad Weekend Getaways under 200 kilometers
Gowtham posted a topic in Road Trips,
Weekend getaways-
-
- 67 replies
Picked By
Gowtham, -
-
Road trip in Electric Vehicle, San Francisco to Los Angeles
Gowtham posted a topic in Road Trips,
Sharing a road trip experience in Tesla, will be update this log on daily basis(Three days trip).
This is not a leisure travel, We had to go on a work trip from SF to LA.
I will be sharing road trip experience in EV with Pros and Cons when compared with ICE cars.
Car Specifications:
Range: 600 kilometers per charge (EPA) 0-100: 3.8 Seconds Top speed is limited to 250km/hr Supports upto Level-3 charging : 250KW/hr Will be sharing more information on Tesla Super chargers in the upcoming posts
A day before the trip
Planning:
Road trips in electric cars need some planning when compared to traditional(ICE) cars.
STEP 1:
You can use Tesla website to plan your trip, Select the car that you are planning to take on a drive Check out the website for fun : https://www.tesla.com/trips SF to LA has close to 10+ Tesla super chargers(Distance : 600+ kilometers)
STEP 2:
Calculate total charging time required, you can check Tesla website to understand your trip plan Total charging time required on a 616 kilometers trip is 55 minutes Details given above are in ideal conditions: 90% charge before you start, follow speed limits, no opposite wind, no cold weather(below 0C), no snow storm etc In real world, range varies, this is similar to our ARAI mileage Tesla calculates/displays range based on EPA(ARAI), add 15~20% range error All the Tesla Chargers are located close to some of the best food courts/restrooms Total saving for the trip when compared with gas cars is 52$
If you have any queries comment below, will answer them.-
-
- 5 replies
Picked By
Gowtham, -
-
Ola mega electric factory, can produce 30 EV's per minute
Gowtham posted a topic in Driving in India,
Product capacity 20 lakhs two wheelers per year 500 Acers 10,000 jobs, you can apply here (https://olaelectric.com/) 10 production lines Will produce an EV every 2 seconds First Indian electric two-wheeler company to begin international exports
Key Specs:
100 kilometers per charge Top speed 100km/hr
Check out the video:
-
- 1 reply
Picked By
Gowtham, -
-
New e-Pass Requirements by States (March 2021 onwards)
Kshitiz posted a topic in Road Trips,
Hi all,
I wanted to create the list of states re-imposing e-pass requirements to travel, including by road.
Here's what I found. Please add to the list and also once it is lifted, please update the thread.
I hope it will be helpful
Tamil Nadu
Dated 9-Mar-2021
All passengers coming by road and by flight to Tamil Nadu need an e-pass, the state government has decided, in a slew of new rules for domestic and international passengers coming to the state. All passengers from states, except Andhra Pradesh, Karnataka and Puducherry, need an e-pass to enter the state.
https://www.thenewsminute.com/article/passengers-coming-tamil-nadu-need-e-pass-here-s-how-apply-144882-
-
- 14 replies
Picked By
Gowtham, -
-
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.